The Big Idea

A good website is not born perfect in its first version; it improves through repeated cycles of planning, trying and measuring. This lesson gives you three tools: the PDCA cycle (Plan, Do, Check, Act) to organise continuous improvement, design thinking to understand a problem from the user's point of view and try out solutions, and A/B testing to compare two versions in an organised experiment on a defined metric. The aim is for every improvement decision to rest on evidence and repeated learning, not guesswork.

Why Is Improvement Iterative?

In Lesson 4-3 you used evidence to find out what works and what needs improving. In this lesson you use that evidence to plan a change, test it and repeat the improvement.

Websites often need reviewing and improving after real use, because real users behave in ways the designer did not expect. Their feedback and the usage data reveal what works and what does not. That is why many digital products benefit from iterative improvement instead of assuming the first version is final.

The PDCA Cycle

The PDCA cycle is a method that keeps improvement moving forward continuously by repeating four steps. It is not only for websites: it is widely used in fields such as business improvement and quality management. Its name comes from the first letter of each step:

P: Plan

Set goals and make an improvement plan. A good goal is clear and measurable. Example: "raise the sign-up form completion rate from 40% to 50%", then plan a suitable change, such as cutting the number of form fields.

D: Do

Carry out the plan. For example, change the page design as planned.

C: Check

Measure the results and judge how far the goal was reached. Example: measure the sign-up completion rate after the change and compare it with the baseline, the value before the change (40%), and with the goal (50%). This is the step that tells you whether your change actually worked.

A: Act

Based on the results, adopt what worked or change the plan and decide the next step. If the change met the goal, it can be adopted or expanded. If not, review the cause and the plan. Then a new cycle begins.

The PDCA cycle with a website example Four boxes joined by arrows in a loop. P, Plan: set a goal and a plan, for example raising sign-up completion from 40% to 50%. D, Do: carry out the plan, such as changing the sign-up page design. C, Check: measure the results and judge whether the goal was met, comparing with the 40% baseline and the 50% goal. A, Act: adopt what worked or revise the plan; if the goal was met, adopt or expand the change, and if not, review the cause and the plan. A dashed arrow leads from Act back to Plan, labelled next cycle, with the word Repeat in the middle. The PDCA cycle: continuous improvement by repetition P Plan Set a goal and a plan Goal: raise sign-up completion from 40% to 50% D Do Carry out the plan Change the sign-up page design C Check Measure and judge the result Compare with the 40% baseline and the 50% goal A Act Adopt what worked or revise Goal met? Adopt or expand it Not met? Review cause and plan Repeat next cycle
The value of PDCA is in repetition: each cycle starts from what the last one taught you.

Iterative improvement: small or large, but measured

Iterative improvement helps you learn from results instead of assuming the first version will be perfect. A change can be small or large, depending on the goal and the evidence. What matters is that it has a clear goal, that you measure it, and that you decide based on the measurement. The PDCA cycle is meaningful when it is repeated; it is not a method that is finished after one round.

Design Thinking

Design thinking is a flexible way to understand a problem from the user's point of view, try out solutions and then improve them. The book uses a common model of five modes, and you can move back between them rather than following a strict straight line:

  1. Empathize: learn about the user's experience and needs through observation, questions and suitable research. For example, sit with students trying to sign up for a school trip and watch what confuses them.
  2. Define: based on what you learned while empathising, state clearly the problem to solve. For example: "students cannot find the sign-up link on a phone screen".
  3. Ideate: generate lots of ideas to solve the problem, without judging them too early.
  4. Prototype: quickly build a prototype based on the ideas. A prototype is a quick, testable draft: a paper sketch or a simple page.
  5. Test: let users try the prototype, then collect their feedback and observe what happens.

Depending on the test results, you may go back to Empathize or Define. Improvement moves back and forth, not in one direction.

The five modes of design thinking Five boxes in a row joined by arrows: Empathize to understand users, then Define to state the problem, then Ideate to come up with many ideas, then Prototype as a quick draft, then Test, where users try it. From Test, two dashed arrows lead back: one to Define, based on test results, and one to Empathize, to understand users better. At the bottom: improvement moves back and forth, not in one direction. Design thinking: five flexible modes ① Empathize understand users ② Define state the problem ③ Ideate many ideas ④ Prototype a quick draft ⑤ Test users try it back to Define, based on test results or back to Empathize to understand users better Improvement moves back and forth, not in one direction
Five flexible modes: testing may send you back to understanding the user again.

A/B Testing

A/B testing is an experiment that compares two versions, A and B, on a metric decided in advance, with users or visits split between them as randomly as possible or according to a suitable experiment design.

The book's example: compare version A with a red buy button and version B with a blue buy button to see which gets more clicks. Half the visitors see A and half see B, and then we compare the click rate of each version.

How an A/B test works A box at the top for 10,000 visitors split at random, as far as possible, between two versions of a page. Version A has a red buy button; 5,000 visitors, 200 clicks, which is 4.0%. Version B has a blue buy button; 5,000 visitors, 275 clicks, which is 5.5%. The metric is clicks divided by visitors. Below, three rules: one clear difference to isolate its effect, the metric and analysis plan decided before starting, and enough data before judging. A note at the bottom: changing several things at once measures the whole bundle, not each part. A/B testing: two versions, a metric set in advance, enough data Visitors: 10,000 split at random, as far as possible Version A Red buy button Visitors: 5,000 · clicks: 200 4.0% Version B Blue buy button Visitors: 5,000 · clicks: 275 5.5% clicks ÷ visitors One clear difference to isolate its effect Metric & analysis decided beforehand Enough data before judging Changing several things at once measures the whole bundle, not each part
Each version's rate is calculated separately: 200 ÷ 5,000 = 4.0% and 275 ÷ 5,000 = 5.5%.

Key points for A/B testing

  1. If your goal is to learn the effect of one particular difference, make the difference between the versions clear and specific. If you change the button colour, the page heading and the photo all at once and B wins, you will not know which change made the difference. Testing a bundle of changes measures the effect of the whole bundle, not of each element on its own.
  2. Decide the metric and the analysis plan before the test, then collect a large enough sample before judging. Don't choose the metric after seeing the results, and don't decide after only twenty visitors; a difference in a small sample may be pure chance.

How do the three tools fit together?

  • Design thinking helps you understand the user's problem and generate ideas to solve it.
  • A/B testing compares two ideas with real data on a defined metric.
  • The PDCA cycle organises the whole effort: plan the change, do it, check by measuring (an A/B test can be the checking tool), then act and start a new cycle.

These tools do not guarantee that every change will succeed, but they make decisions based on evidence and repeated learning.

Try It Yourself

Try
A PDCA cycle for the club sign-up page
Very few students sign up for the club's event through its web page. Put the steps of one PDCA cycle to improve this in order.
1. Set a numeric goal, such as 8 out of 10 classmates finding the sign-up link within five seconds, and plan to move the link to the top of the page
2. Test ten classmates again and compare the result with the baseline and the goal
3. If the goal was met, adopt the change; if not, review the cause and adjust the plan for the next cycle
4. Move the sign-up link to the top of the page as planned
Use the up and down buttons to move each step, then press Check.
Try
Which design-thinking mode are you in?
A team is improving the school library website. Sort each activity by the design-thinking mode it represents.
Items (8)
Tap an item to select it, then tap the category it belongs to.
Nothing here yet
Nothing here yet
Nothing here yet
Nothing here yet
Nothing here yet
Try
Work out an A/B test result yourself
A
B
Rate A
0.4%
Rate B
0.5%
Difference (B − A) · percentage points
+0.1
p-value
0.0182
Two-proportion z-test (two-sided, normal approximation)
p̂ = (200 + 250) / (50,000 + 50,000) = 0.0045
SE = √(p̂(1 − p̂)(1/50,000 + 1/50,000)) = 0.000423
z = (0.005 − 0.004) / SE = 2.362
p = 2 × (1 − Φ(|z|)) = 0.0182 ≤ α = 0.05
Likely statistically significant at α = 0.05 (p ≤ α): reject H0.
Statistically significant does not mean practically important: is the difference worth the cost?

Common Mistakes

"The PDCA cycle is done once and that's it"

The cycle gets its value from repetition: each round starts from what the previous one taught.

PDCA is a method for continuous improvement by repeating four steps: Plan, Do, Check, Act.

"The Check step is deciding the next improvement"

That mixes up two consecutive steps.

Check = measure the results and judge whether the goal was met. Act = adopt what worked or revise the plan and set the next step.

"Design thinking is five steps followed in strict order, with no going back"

The Arabic edition calls it a flexible method.

Design thinking has five modes, and depending on test results you may return to Empathize or Define; improvement moves back and forth.

"In an A/B test we can decide after the first twenty visitors"

A difference in a small sample may be chance.

Decide the metric and analysis plan before the test, and collect a large enough sample before judging.

"We changed the colour, heading and photo together and results improved, so the colour did it"

In that case you cannot credit any single element.

Testing a bundle of changes measures the whole bundle. To learn the effect of one element, make it the clear, specific and only difference between the two versions.

Key Points

  • Websites improve through repeated cycles that learn from results, instead of assuming the first version is final.
  • PDCA cycle: Plan (set the goal and plan), Do (follow the plan), Check (measure and compare with baseline and goal), Act (adopt what worked or revise), then repeat.
  • PDCA is also used in business improvement and quality management, and its value lies in repetition.
  • Design thinking: a flexible way to solve problems from the user's point of view through five modes: Empathize, Define, Ideate, Prototype, Test, with the option to go back.
  • A prototype is a quick, testable draft.
  • A/B testing: comparing two versions on a metric set in advance, with visitors split as randomly as possible.
  • In A/B testing: make the difference clear and specific if you want the effect of one change (a bundle measures the bundle), set the metric beforehand, and collect enough data before judging.

FAQ

What is the difference between Check and Act in the PDCA cycle?

In Check you measure the results after the change and compare them with the baseline and the goal. In Act you decide based on that measurement: adopt or expand the change if it worked, or review the cause and revise the plan if it did not, and then a new cycle starts.

Do the five design-thinking modes have to be followed in order?

The Arabic book presents them as a flexible model you can move back through, since testing may send you back to Empathize or Define. Still, learn their usual order: Empathize, Define, Ideate, Prototype, Test.

Can I change more than one element in an A/B test?

You can, but then the test measures the effect of the whole bundle and does not reveal the effect of each element. If you want to know the effect of one change, make it the clear, specific difference between the two versions. In the book's questions, changing several elements at the same time counts as unsuitable when the aim is to learn each change's effect.

How do I work out each version's result in an A/B test?

Divide the number who met the metric, such as clicks, by the number of visitors to that same version, then multiply by 100. For example, 200 clicks from 5,000 visitors gives 4.0%, and 275 from 5,000 gives 5.5%. Don't decide until the sample is large enough.